The Dzhankeldy 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance of the plant.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance of the plant.
Nearby cities:
Coordinates: 40°51'12"N 63°20'30"E
- Bash 500 MW Wind Park Project 108 km
- Wind turbine 1171 km
- Wind turbine 1171 km
- Wind turbine 1172 km
- Wind turbine 1172 km
- Wind turbine 1172 km
- Wind turbine 1172 km
- Tabriz Wind turbines 1491 km
- Wind turbine 1841 km
- Wind turbine 1842 km
- Bel-Tau Mountain 8.4 km
- Mount Quljuqtau 39 km
- abandoned railway station 46 km
- Kara-Kyr Hill 47 km
- Golovnye 73 km
- Katlavan 76 km
- Ayakagytma Lake 105 km
- Rometan Tepa 131 km
- Vabkent cotton ginnery factory 137 km
- Bukhara Oasis 142 km