Borky-2 Solar Power Plant
Ukraine /
Kharkivska /
Utkivka /
World
/ Ukraine
/ Kharkivska
/ Utkivka
, 8 km from center (Утківка)
solar farm, 2019 construction
Capacity: 4 MW.
Put into operation: December, 2019.
Put into operation: December, 2019.
Nearby cities:
Coordinates: 49°43'12"N 36°2'5"E
- Borky-1 Solar Power Plant 3.3 km
- Summer cottage area 2 km
- Borki forest 2.7 km
- Pond 2.8 km
- Summer cottage area 3.3 km
- Summer cottage area 3.8 km
- Pond 4.2 km
- Soldatskyi Pond 4.5 km
- Pond 5.4 km
- Ordivskyi Pond 6.4 km
- Nova Vodolaha settlement territorial community 12 km