Borky-1 Solar Power Plant
| solar farm, 2019 construction
Ukraine /
Kharkivska /
Utkivka /
World
/ Ukraine
/ Kharkivska
/ Utkivka
, 7 km from center (Утківка)
solar farm, 2019 construction
Capacity: 2.18 MW.
Put into operation: December, 2019.
Put into operation: December, 2019.
Nearby cities:
Coordinates: 49°42'30"N 36°4'56"E
- Borky-2 Solar Power Plant 3.9 km
- Pond 1.9 km
- Dakhnovskyi Pond 2.1 km
- Birky Railway Station 2.4 km
- Borki forest 2.7 km
- Cemetery 2.9 km
- Forest 3.4 km
- Borky-2 Solar Power Plant 3.7 km
- Reservoir 4.8 km
- Zmiivska Urban Hromada 11 km
- Novovodolazka Settlement Hromada 16 km