Boarding House Wind Farm
United Kingdom /
England /
March /
World
/ United Kingdom
/ England
/ March
wind farm
Add category
5 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92 m). Hub height: 65 m. Total nominal power: 10,250 kW. Commissioning: 2015/10
Nearby cities:
Coordinates: 52°31'12"N 0°2'19"E
- Hornsea 2 Wind Farm 190 km
- Hornsea One Wind Farm 195 km
- Belwind Wind Farm 207 km
- Northwind wind farm 215 km
- Rentel wind farm 218 km
- Hornsea 3 Offshore Wind Farm 218 km
- Thornton Bank wind farm 220 km
- Norther wind farm 226 km
- Noordoostpolder Wind Farm 375 km
- Horns Rev 2 601 km
- Doddington 3.1 km
- Wimblington 3.2 km
- Neale-Wade Academy 4 km
- Stonea Camp (earthwork) 6.3 km
- HMP Whitemoor 6.8 km
- March Sewage Treatment Works 8.1 km
- Thomas Clarkson Academy 17 km
- Wisbech Park 18 km
- Nordelph Farm 18 km
- Wisbech Cemetery 19 km