Intermodal Yard

Mexico / Baja California / Cuervos /
 intermodal terminal  Add category
 Upload a photo

• The 100-acre MRL intermodal facility includes a 300’ long double track rail bridge that crosses a storm water channel on the perimeter of the MRL site.

• Two 1-mile long strip tracks for loading and unloading trains.

• One run around and tail track for repositioning locomotives on trains.

• An engine tie-up track and maintenance pit for service of railcars and locomotives with access to electricity and water.

• Crane maintenance pad with electricity and water.

• Rail container wash station with a water recycling system.

• Yard lighting to accommodate nighttime operation.

• 6,800’ long berm for visual screening of intermodal yard operations.
Nearby cities:
Coordinates:   33°1'21"N   115°0'18"W
This article was last modified 6 years ago