Goethals Bridge

USA / New York / Bloomfield /
 road bridge, cable-stayed bridge
 Upload a photo

New dual-span cable-stayed bridge under construction to replace the current substandard structure. The southern (eastbound) span opened to both directions of traffic on June 10th, 2017; the original span was subsequently shut down. The northern (westbound) span opened in 2018.
Nearby cities:
Coordinates:   40°38'6"N   74°11'44"W
This article was last modified 7 years ago