Big Turtle Wind Farm
USA /
Michigan /
Port Hope /
World
/ USA
/ Michigan
/ Port Hope
wind farm, invisible
Big Turtle wind farm is located in the southwest corner of Rubicon Township, Huron County, Michigan. It is sited about 5 miles SSW of Port Hope and 5 miles WNW of Harbor Beach, in the northeast quadrant from the intersection of Rapson Road and N Finkel Road. Commissioned in 2014, it consists of 10 Gamesa G114/2000 wind turbines with a combined nominal capacity of 20 MW.
Nearby cities:
Coordinates: 43°52'38"N 82°45'11"W
- K2 Wind Farm 85 km
- Goshen Wind Farm 95 km
- Gratiot Wind Park 155 km
- South Kent Wind Farm 161 km
- Port Burwell Wind Farm 200 km
- Summerhaven Wind Energy Centre 238 km
- Grand Renewable Wind Farm 251 km
- Niagara Region Wind Farm 269 km
- Lee-DeKalb Wind Energy Center 555 km
- Mesgi’g Ugju’s’n Wind Farm 1322 km
- Rubicon Township 4.6 km
- Bloomfield Township 6.3 km
- Sigel Township 8.9 km
- Huron Township 14 km
- Lincoln Township 15 km
- Paris Township 17 km
- Verona Township 17 km
- Sherman Township 17 km
- Dwight Township 20 km
- Bingham Township 23 km