Sabodala Pit
Senegal /
Tambacounda /
Kedougou /
World
/ Senegal
/ Tambacounda
/ Kedougou
open-pit mine
Add category
Pre-production and stripping, then mining in the Sabodala pit commenced in Januray 2008, and is scheduled to be depleted in 2018. Mining is carried out by the owner using four PC3000, and one PC2000 shovels, as well as two WA900 wheel loaders. The haul fleet includes thirty 91t Komatsu KD785-7 trucks, and other equipment includes excavators, graders, and dozers. Drilling is done by fix Sandvik Panterra DP1500 and three Bucyrus/Cat Reedrill SKF-12 dril rigs. Mine planning was carried out using MineSche software.
Nearby cities:
Coordinates: 13°11'2"N 12°6'41"W
- Simandou Iron Prospect 621 km
- Bou Craa 1476 km
- Cornish China Clay Belt 4194 km
- IOC - Carol Lake mine 6540 km
- Cerrejon Coal Mine 6585 km
- Mina Caypa El Cerrejon 6589 km
- Schefferville 6606 km
- Coal Mine 6698 km
- Canadian Malartic Open Pit - 2014 7163 km
- Quarry 7287 km
- Sabodala Mining Concession 2 km
- Tailings Storage Facility 3.2 km
- Loulo Gold Project 79 km
- Tabakoto-Kofi Nord Permit 84 km
- Gounkoto Mine 86 km
- Gounkoto Gold Project 88 km
- Sadiola Gold Mine 91 km
- Tabakoto-Segala Permit 100 km
- Niokolo-Koba National Park 103 km
- Fekola Gold Project 105 km