Total Solutions LTD. (10 Ramadan City)
Egypt /
as-Sarqiyah /
El Asher men Ramadan /
10 Ramadan City
World
/ Egypt
/ as-Sarqiyah
/ El Asher men Ramadan
, 8 km from center (العاشر من رمضان)
administrative building, factory
Steel fabrication
ASME facility
ASME Vessels, API Tanks, Piping, Offshore containers (EN 12079 and DNV 2.7-1), Steel structure, and general contracting.
Main clients:
BP
Schlumberger
Halliburton
Siapem
P&G
ExxonMobil
ASME facility
ASME Vessels, API Tanks, Piping, Offshore containers (EN 12079 and DNV 2.7-1), Steel structure, and general contracting.
Main clients:
BP
Schlumberger
Halliburton
Siapem
P&G
ExxonMobil
Nearby cities:
Coordinates: 30°17'10"N 31°48'53"E
- Conference center 25 km
- East Hub Mall 27 km
- Citadel Commercial Complex 31 km
- Clock Towers 32 km
- The Grey Mall - HDP 39 km
- AlManara 51 km
- Cairo International Conferences 55 km
- Helnan Dream Hotel 81 km
- مبنى ادارة الجامعة 263 km
- Administrative Building 350 km
- Industrial Sector No A4/ 0.6 km
- industrial sector No A3 1 km
- Industrial Sector No A3/ 2.1 km
- Industrial Sector No A5 2.2 km
- المتحدة للزيوت والصابون 2.2 km
- industrial sector No A2 2.5 km
- Industrial zone - 10th of Ramadan City 4 km
- ARMA Factory 4 km
- A Watered Sands 4.4 km
- Tenth of Ramadan industrial zone - East 5 km