Limoneira Ranch Solar Farm II

USA / California / Ducor /
 solar park, solar array
 Upload a photo

Limoneira Ranch Solar Farm, Ducor, CA.

In 2008, Limoneira completed two state-of-the-art solar projects. The first, at company headquarters in Santa Paula, CA., is a 5.5-acre photovoltaic orchard that generates a full megawatt of electricity. Representing one-third of the Company’s total use. Solar energy powers Limoneira’s lemon-packing house and storage facility. In the Tulare County town of Ducor, about 150 miles north of Santa Paula, Limoneira installed four smaller solar arrays that together generate another full megawatt of electricity to power 250-horsepower motors that pump deep well water into reservoirs for the irrigation of 1,000 agricultural acres. It is estimated that, over their expected 25-year lifespan, Limoneira’s solar generation of 84 million kilowatt hours will save at least 64,000 tons of greenhouse gases that would have otherwise been emitted by an ordinary oil- or coal-firing power plant.
Nearby cities:
Coordinates:   35°52'18"N   119°1'32"W
This article was last modified 8 years ago