Kansanshi Copper Smelter
Zambia /
North-Western /
Kansanshi /
World
/ Zambia
/ North-Western
/ Kansanshi
smelter
Add category
This is the Kansanshi copper smelter development project which involves construction of a new smelter which will be shared by the Kansanshi (33%) and Sentinel (67%) mines. The project is estimated to cost approximately $690m and will be capable of producing 300,000t of treated copper concentrate annually. It is scheduled to start operations by mid 2014 and will be fully operational in early 2016. WorleyParsons will provide engineering services for the project.
Nearby cities:
Coordinates: 12°5'2"S 26°23'54"E
- Selous Metuallurgical Complex 789 km
- Polokwane Smelter 1368 km
- Impala Platinum Mine Metallurgy Division 1499 km
- Machadodorp Chrome Smelter 1568 km
- Samancor Metalloys 1619 km
- PT. SMELTING 9446 km
- WMC Nickel Smelter 9807 km
- Kambalda Nickel mill and industrial area. 9817 km
- Xstrata - Mount Isa mines 11857 km
- Doniambo Nickel Smelter 14238 km
- Kansanshi Mine 3.5 km
- Lumwana Mine Grant (8089) 61 km
- Chimiwungo Pit 61 km
- Malundwe MR1 Waste Dump 64 km
- Malundwe Pit 65 km
- Musangezhi Dam 113 km
- Trident Project 114 km
- Tailings Storage Facility 119 km
- Waste Dump 120 km
- Sentinal Copper Mine 120 km