Jacobina Processing Plant
Brazil /
Bahia /
Jacobina /
World
/ Brazil
/ Bahia
/ Jacobina
production
Add category
The mineral process plant at the Jacobina Mine Complex was expanded to 6,000 tpd in 2008 and during 2007 through 2009, the tailings dam capacity was increased. The current process has a capacity of 6,500 tpd and involves the following activities: three-stage crushing of the ore, grinding of the crushed material into a pulp, gravity concentration of coarse gold, leaching of the pulp in a conventional cyanide leaching process, gold extraction of the enriched solution in CIL and CIP tanks, and gold recovery in an electrolytic circuit.
Nearby cities:
Coordinates: 11°15'34"S 40°31'1"W
- Jacobina Mine Crushing Area 0.3 km
- 1400 Paraguassu Petrol Station 183 km
- Gas Station 284 km
- Usina da Pedra 292 km
- Jatoba Gas Station 357 km
- Caetité Rio 1 Solar Field 358 km
- Gas Station 385 km
- Gas Station 462 km
- Posto Global 497 km
- Gas Station 664 km
- Basal Mine 0.4 km
- Tailings Storage Facility 1 1.8 km
- Canavieiras South Mine 2 km
- Jacobina Gold Mine Tailings Dam 1 2 km
- Morro do Vento South Mine 2.2 km
- Canavieiras Central Mine 2.8 km
- Joao Belo Waste Dump 2.9 km
- Canavieiras North Mine 3.5 km
- Embasa Reservoir 4.1 km
- Jacobina Mine Complex 5.5 km