CIAL has decided to construct a New International passenger Terminal to meet the increasing passenger traffic. Based on the traffic forecast study the new terminal is planned for a peak hour handling capacity of 4000 pax and to meet the projected traffic growth till year 2025. The Terminal is expected to cost around Rs 450 Crores.
The salient features of new Terminal are:
Elevation to feature Kerala Temple architecture.
Two level terminal – Arrival in ground level & Departure in first level.
Finger pier concept to handle 13/15 aircraft through aerobridges during peak operations.
Total of 15 lakh sqft built up area.
Elevated road approach to Departure level.
Facilities at a glance:
Departure-level 2
Covered Road/Kerb area 3 lakh Sft – 3+3+2 lane traffic
Check in counters 56 No.s , provision for additional 28 no.s
Immigration counters 48 No.s
Security Frisking –space for 6 no.s X-ray modules
Duty free shop 10000 sft
Boarding gate 13/15 No.s
Departure –level 3
Food court 2 no.s
Premium lounges -4 No.s
Arrival –Level 1
Arrival corridor
Connectivity to Departure for Transit passengers
Connectivity to Remote arrival
Immigration Counters -50 No.s
Aquarium, Vertical garden, Hanging Installations, Wall murals
Arrival –Level 0
Baggage makeup area -5 carousels
Duty free shop-20000 sft
Conveyor Belt -6 no.s
Passenger Exit lounge- 18000 sft with 2main exit points
Visitors waiting and related concessionaries
Meet and Greet area
3+3+3 lane traffic
25 m wide corridor with landscape and connectivity to Departure
New International Passenger Terminal
CIAL has decided to construct a New International passenger Terminal to meet the increasing passenger traffic. Based on the traffic forecast study the new terminal is planned for a peak hour handling capacity of 4000 pax and to meet the projected traffic growth till year 2025. The Terminal is expected to cost around Rs 450 Crores.
The salient features of new Terminal are:
Elevation to feature Kerala Temple architecture.
Two level terminal – Arrival in ground level & Departure in first level.
Finger pier concept to handle 13/15 aircraft through aerobridges during peak operations.
Total of 15 lakh sqft built up area.
Elevated road approach to Departure level.
Facilities at a glance:
Departure-level 2
Covered Road/Kerb area 3 lakh Sft – 3+3+2 lane traffic
Check in counters 56 No.s , provision for additional 28 no.s
Immigration counters 48 No.s
Security Frisking –space for 6 no.s X-ray modules
Duty free shop 10000 sft
Boarding gate 13/15 No.s
Departure –level 3
Food court 2 no.s
Premium lounges -4 No.s
Arrival –Level 1
Arrival corridor
Connectivity to Departure for Transit passengers
Connectivity to Remote arrival
Immigration Counters -50 No.s
Aquarium, Vertical garden, Hanging Installations, Wall murals
Arrival –Level 0
Baggage makeup area -5 carousels
Duty free shop-20000 sft
Conveyor Belt -6 no.s
Passenger Exit lounge- 18000 sft with 2main exit points
Visitors waiting and related concessionaries
Meet and Greet area
3+3+3 lane traffic
25 m wide corridor with landscape and connectivity to Departure
Nearby cities:
Coordinates: 10°9'26"N 76°23'45"E
- Indira Gandhi International Airport T3 (78 Aerobridges) 2050 km
- Terminal building 2235 km
- Chandigarh Airport International Terminal 2284 km
- Air Strip 2485 km
- Dubai International Airport - Terminal 3 2785 km
- Dubai International Airport - Terminal 1 2787 km
- AUH Midfield Terminal (Under Construction) 2800 km
- Sarakhs South Airport 3311 km
- Yazd International Airport 3326 km
- Isfahan International Airport 3565 km
- Taxiway 0.7 km
- Cochin International Airport 0.8 km
- Runway 09-27 0.9 km
- Vappalassery 1.1 km
- Solar Array 1.3 km
- Avanamcode 1.6 km
- Maikavu 1.6 km
- CIAL Golf & Country Club - Golf Course 2.4 km
- Angamaly 3.1 km
- Thrissur (District) 35 km