Orava Dam Wall

Slovakia / Zilinsky / Tvrdosin /
 water, dam, hydroelectric power station/plant
 Upload a photo

Hydroelectricity Orava is located at the first major accumulation tank in the basin of redressing the balance with seasonal runoff. This helps capture the torrential tributaries of spring snowmelt and summer storms and winter, improve flow rates at the balance thus increasing the proportion of electricity generated by all located below in the winter.

Category lattice - accumulation
21.75 MW installed power
Flow Orava river
Kaplan type turbines
Flow m3.s - 1 2 x 50.0
Number turbo aggregates 2
Year of putting into working . 1953
The average annual production of 31 GWh