6-level basement parking (U/C) (Kuala Lumpur)

Malaysia / Kuala Lumpur / Kuala Lumpur

H) CADANGAN TAMBAHAN 6 TINGKAT BESMEN TEMPAT LETAK KERETA DI BAWAH SEBAHAGIAN TAMAN METROPOLITAN KLCC
I) CADANGAN TEROWONG KENDERAAN MASUK DAN KELUAR KE RUANG TEMPAT LETAK TAMBAHAN BESMEN DARI ARAH LORONG KUDA
Untuk Tetuan : TETUAN CITITOWER SDN BHD
(KLCC-Qatari JV project)
Nearby cities:
Coordinates:   3°9'24"N   101°42'58"E

Comments

  • The Board of Directors of Sunway is pleased to announce that Sunway Construction Sdn Bhd (“SunCon”), a wholly-owned subsidiary of Sunway Holdings Sdn Bhd which in turn is a wholly-owned subsidiary of Sunway, had on 18 March 2013, accepted the letter of award worth RM304 million from Cititower Sdn Bhd [a joint venture company between KLCC (Holdings) Sdn Bhd and QD Asia Pasific Ltd] for package 1: construction and completion of North East Car Park (NEC) underneath KLCC Park and associated works for the proposed Lot 185, Lot 167(K) and Lot 176 mixed development at Persiaran KLCC, Kuala Lumpur City Centre (hereinafter referred to as the “Proposed Project”). The scope of works include, amongst others, excavation works, construction and installation of diaphragm wall, foundation and piling works, construction of 6 levels basement car park and its associated works. The Proposed Project is expected to commence upon handing over of site possession which is to be determined later, with a construction period of 178 weeks henceforth. It is expected to contribute positively to the earnings of Sunway Group from the financial year ending 31 December 2013 onwards.
This article was last modified 11 years ago