Mindanao Container Terminal (Tagolaon) (Sugbongcogon)
Philippines /
Northern Mindanao /
Bugo /
Sugbongcogon
World
/ Philippines
/ Northern Mindanao
/ Bugo
seaport, wharf, container / transport / storage terminal
Container terminal.
The MCT is a Flagship Project of Mindanao and it is one of the most important infrastructure needed to pump prime Mindanao Development.
Considering the existing capacity of the Cagayan de Oro Baseport which is only 1.8 Million Metric Tons, vis-a-vis increase in cargo volume which for year 2002 had actually reached 2.79 Million Metric Tons, the MCT can efficiently fill-in the supply gap for an efficient cargo handling facility.
The MCT, with its state of the art facilities and cargo handling equipment, unloads one container van in about 2.5 minutes as compared to the 10 minutes unloading in an ordinary port.
Thus with MCT, cargo can be efficiently shipped not only to and from PIE-MO, but also those coming in and out of the other places in Mindanao, into the Brunei, Indonesia, Malaysia, Philippines East-Asia Growth Area or the BIMP-EAGA Region, as well as the Asia-Pacific Region.
The total cost of the MCT is US$ 85.34 Million or its peso equivalent of about Php 3.24 Billion of this amount, 85% is funded by JBIC and 15% is financed by PIA. Its design and management during construction stage is by Pacific Consultants International (PCI), Japanese Contractor is Mitsubishi-Kawasaki-Toyo Joint Venture (MKT-JV).
The MCT is a Flagship Project of Mindanao and it is one of the most important infrastructure needed to pump prime Mindanao Development.
Considering the existing capacity of the Cagayan de Oro Baseport which is only 1.8 Million Metric Tons, vis-a-vis increase in cargo volume which for year 2002 had actually reached 2.79 Million Metric Tons, the MCT can efficiently fill-in the supply gap for an efficient cargo handling facility.
The MCT, with its state of the art facilities and cargo handling equipment, unloads one container van in about 2.5 minutes as compared to the 10 minutes unloading in an ordinary port.
Thus with MCT, cargo can be efficiently shipped not only to and from PIE-MO, but also those coming in and out of the other places in Mindanao, into the Brunei, Indonesia, Malaysia, Philippines East-Asia Growth Area or the BIMP-EAGA Region, as well as the Asia-Pacific Region.
The total cost of the MCT is US$ 85.34 Million or its peso equivalent of about Php 3.24 Billion of this amount, 85% is funded by JBIC and 15% is financed by PIA. Its design and management during construction stage is by Pacific Consultants International (PCI), Japanese Contractor is Mitsubishi-Kawasaki-Toyo Joint Venture (MKT-JV).
Nearby cities:
Coordinates: 8°31'28"N 124°45'6"E
- Ningbo Meishan Port 2385 km
- Pasir Panjang Container Terminal 2463 km
- Yangshan Deepwater Port ( Yangshan Container Terminal ) 2478 km
- Taicang Container Port 2601 km
- Pusan Newport International Terminal 2985 km
- Qingdao New Qianwan Container Terminal (QQCTN) - module 4 3094 km
- Dalian Beiliang Grain Terminal 3405 km
- Tianjin Port Bulk Logistics Center 3462 km
- Nanjiang Port Area 3464 km
- Port of Bayuquan 3545 km
- PRYCE CORPORATION PROPERTY 1.9 km
- MORAZ 2.1 km
- SIHAYON 2.5 km
- Villa Trinitas Subdivision Phase 2 2.8 km
- FDC Coal Power Plant 4 km
- BDO ATM - STEAG Villaneuva Power Coal Plant 5 km
- STA. ANA, TAGOLOAN MISAMIS ORIENTAL 5.4 km
- Philippine Sinter Corporation 5.6 km
- Barangay Katipunan 5.8 km
- Macajalar Bay 16 km