Overpass (Kyiv)
Ukraine /
Kyyiv /
Kiev /
Kyiv
World
/ Ukraine
/ Kyyiv
/ Kiev
, 3 km from center (Київ)
World / Ukraine / Kiev City
trestle (bridge), do not draw title
As part of interchange reconstruction on Postal Square, the overpass has been built for nonstop traffic from Vladimir descent to Naberezhno-Khreschatitska street.
Roadway of overpass has two lanes into only one way, each lane is 3.75 meters broadwise.
Construction started in summer 2012, the opening was on May 25, 2013.
Roadway of overpass has two lanes into only one way, each lane is 3.75 meters broadwise.
Construction started in summer 2012, the opening was on May 25, 2013.
Nearby cities:
Coordinates: 50°27'37"N 30°31'32"E
- Helicopter site's overpass 1.7 km
- Overpass 3 km
- Overpass on Dneprovsky downhill 3.8 km
- The left bank exit of Darnitsky bridge (under construction) 6.7 km
- Trestle 108 km
- Unloading overpass 115 km
- Trestle 130 km
- Trestle 131 km
- Overpass 137 km
- Overpass 137 km
- Volodymyr Hill 0.5 km
- Kontraktova Ploshcha 0.7 km
- Old Kyiv 1 km
- Podil 1.4 km
- Central Park 1.8 km
- Shevchenkivskyi raion 4.5 km
- Podilskyi raion 6.2 km
- Dniprovskyi raion 8.4 km
- Desnianskyi raion 12 km
- Kaniv Reservoir 48 km