Overpass on Dneprovsky downhill (Kyiv)

Ukraine / Kyyiv / Kiev / Kyiv
 roundabout / traffic circle, trestle (bridge), 2012_construction, do not draw title

The construction of the overpass has began on October 2011.
Providing an elimination of traffic light at the intersection of Naberezhnoe Road and the Dneprovsky Downhill.
Open April 5, 2012.

The total length of transport crossing is 660 m length of metal solutions span of 362 m flyover consists of 9 towers and 8 spans, the central span is 70 m, width 11.2 m overpass to traffic has two lanes by 3.5 m each and technological access to overpass.
Nearby cities:
Coordinates:   50°26'0"N   30°33'53"E
This article was last modified 11 years ago