Overpass on Dneprovsky downhill (Kyiv)
Ukraine /
Kyyiv /
Kiev /
Kyiv
World
/ Ukraine
/ Kyyiv
/ Kiev
, 5 km from center (Київ)
World / Ukraine / Kiev City
roundabout / traffic circle, trestle (bridge), 2012_construction, do not draw title
The construction of the overpass has began on October 2011.
Providing an elimination of traffic light at the intersection of Naberezhnoe Road and the Dneprovsky Downhill.
Open April 5, 2012.
The total length of transport crossing is 660 m length of metal solutions span of 362 m flyover consists of 9 towers and 8 spans, the central span is 70 m, width 11.2 m overpass to traffic has two lanes by 3.5 m each and technological access to overpass.
Providing an elimination of traffic light at the intersection of Naberezhnoe Road and the Dneprovsky Downhill.
Open April 5, 2012.
The total length of transport crossing is 660 m length of metal solutions span of 362 m flyover consists of 9 towers and 8 spans, the central span is 70 m, width 11.2 m overpass to traffic has two lanes by 3.5 m each and technological access to overpass.
Nearby cities:
Coordinates: 50°26'0"N 30°33'53"E
- Overpass 1.1 km
- Helicopter site's overpass 2.4 km
- The left bank exit of Darnitsky bridge (under construction) 2.6 km
- Overpass 4.2 km
- Trestle 112 km
- Unloading overpass 118 km
- Trestle 132 km
- Trestle 133 km
- Overpass 139 km
- Overpass 139 km
- Lower Lavra 0.4 km
- Spivoche Pole ('Singing Field') 0.4 km
- Kyiv Pechersk Lavra 0.4 km
- Pechersk Landscape Park 0.5 km
- Pechersk Citadel of Kyiv Fortress 0.5 km
- National Museum of the History of Ukraine in the Second World War. The Memorial Complex 0.6 km
- Tsarske Selo 1.3 km
- Zvirynets 2 km
- Lybid River 4 km
- Holosiivskyi raion 12 km