Toko Tailing Dam

Fiji Islands / Western / Vatukoula /
 Upload a photo

This dam is used by the Vatukoula Gold Mine for discharging waste from the mine. All the waste that have been the result of the extraction of Gold are dumped into this Dam. The Dam has been operating since 20years now.
Nearby cities:
Coordinates:   17°28'33"S   177°50'42"E
  •  2160 km
  •  2804 km
  •  3246 km
  •  3246 km
  •  3274 km
  •  3280 km
  •  3280 km
  •  3360 km
  •  3608 km
  •  3940 km
This article was last modified 13 years ago