Gurara Dam

Nigeria / Kaduna / Kachia /
 Upload a photo

The project involves civil and ancillary works for the construction of the Gurara Dam, 52.5 m high and 3 km long at the crest with a reservoir of approximately 880 million m³ of water. Mixed construction in loose materials and rockfill with a clay core and filters. Spillway excavated in granite rock and partly coated in concrete.
The works include 1.16 km supply tunnel, intake tower, drainage tunnel and include mechanical and metalwork. The electric power station will have an installed capacity of 3 x 10 MW.
The following works will be an integral part of the project:
110 km of 132 kV high-tension electrical lines;
Access roads for a total of approximately 50 km;
Pilot irrigation system: Approximately 200 hectares of irrigated areas.

www.webuildgroup.com/en/projects/dams-hydroelectric-pla...
Nearby cities:
Coordinates:   9°38'50"N   7°43'59"E
  •  72 km
  •  117 km
  •  126 km
  •  139 km
  •  174 km
  •  220 km
  •  235 km
  •  349 km
  •  390 km
  •  426 km
This article was last modified 2 days ago