wastewater treatment plant
Add category
1510 Key Rd. SE
Atlanta, GA 30316
(404) 330-6081
www.atlantawatershed.org/facilities/wrc/intrech.htm
The facility provides wastewater treatment for the northern half of the South River sewer service area which encompasses portions of Atlanta and a small portion of DeKalb County. Treated wastewater is conveyed to the South River WRC for further treatment before being discharged to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit.
The Intrenchment Creek WRC was constructed in 1936. Recent upgrades include flow maximization and water reuse improvements, emergency generator and backup power, headworks modifications and dewatering centrifuges.
The treatment process at Intrenchment Creek WRC begins with the removal of larger solids and smaller floatable and settleable solids. Removed solids are landfilled. Next, trickling filters provide biological treatment and reduce the concentration of organic and chemical pollutants. After biological treatment, the remaining suspended solids are removed. After the removal of suspended solids, the partially treated wastewater is conveyed to the South River WRC for further treatment in BPR tanks (see description of South River WRC). The solids that are removed during the wastewater treatment process at Intrenchment Creek WRC are reduced in the digestion process before being dewatered and disposed of in a landfill.
Atlanta, GA 30316
(404) 330-6081
www.atlantawatershed.org/facilities/wrc/intrech.htm
The facility provides wastewater treatment for the northern half of the South River sewer service area which encompasses portions of Atlanta and a small portion of DeKalb County. Treated wastewater is conveyed to the South River WRC for further treatment before being discharged to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit.
The Intrenchment Creek WRC was constructed in 1936. Recent upgrades include flow maximization and water reuse improvements, emergency generator and backup power, headworks modifications and dewatering centrifuges.
The treatment process at Intrenchment Creek WRC begins with the removal of larger solids and smaller floatable and settleable solids. Removed solids are landfilled. Next, trickling filters provide biological treatment and reduce the concentration of organic and chemical pollutants. After biological treatment, the remaining suspended solids are removed. After the removal of suspended solids, the partially treated wastewater is conveyed to the South River WRC for further treatment in BPR tanks (see description of South River WRC). The solids that are removed during the wastewater treatment process at Intrenchment Creek WRC are reduced in the digestion process before being dewatered and disposed of in a landfill.
Nearby cities:
Coordinates: 33°42'11"N 84°19'59"W
- Western Carolina Regional Sewer Authority 218 km
- Village Creek Sewage Treatment Plant 239 km
- Cypress Creek Wastewater Treatment Plant 333 km
- McAlpine Creek Waste Treatment Plant 352 km
- City of Kingsport Wastewater Treatment Plant 354 km
- Water Treatment Plant 450 km
- B. E. Payne Water Treatment Plant 530 km
- Southport Advanced Wastewater Treatment Plant 685 km
- Waste Water Treatment 688 km
- Southerly Wastewater Treatment Plant 691 km
- Eastside Walk 0.8 km
- Woodland Hills 2.6 km
- Georgia Department of Defense - Georgia State Patrol Headquarters 3.1 km
- United States Penitentiary, Atlanta 3.2 km
- Southview Cemetery 3.5 km
- Ormewood Park Neighborhood 4 km
- Hickory Ridge Landfill 4.3 km
- Browns Mill Golf Course 4.4 km
- Grant Park neighborhood 5 km
- DeKalb County, Georgia 17 km