The Bodie Railway and Lumber Co. was organized on February 18, 1881, and shortly afterwards, J. T. Oliver surveyed the route from Bodie to the mill site five miles south of Mono Lake. When completed, the proposed 31.7 miles of roadbed was to descend the 2,000 foot drop in elevation and traverse the alkali flats on the eastern shore of Mono Lake. Thomas Holt, an engineer, was selected to ramrod the project. In addition to this task, Holt was operating a five-ton steamship and several barges on which materials and supplies were transported across Mono Lake to the railroad construction crews.

While the sawmill was being built, grading for the roadbed was started at the top of Bodie Bluff in May, 1881. With the aid of two switchbacks, many cuts, and a 260-foot trestle, the steep and circuitous grade down to lake elevation was accomplished, and by mid-July, the first 20 miles of roadbed had been graded.

The first shipment of rails arrived in August, and as they were being spiked into place, the final five miles of grading was completed to the new mill. In all, some 2,00 tons of rails, spikes and other supplies were used. The total cost of the road reached $450,931. In addition, $81,390 was spent for equipment that included 4 engines, 12 service cars, 51 flat cars, and one caboose. The “last spike” was driven on November 14, 1881 , and a two-car lumber train arrived afterwards to officially open the road.

The following weeks saw the new railway quite active with a scheduled train leaving Bodie each day at 6:30 A.M. and arriving at Mono Mills at 10:00 A.M. The train departed the mill at 2 o’clock each afternoon, and arrived back at Bodie by 6:00 P.M. The ten - to twelve-car train was broken up into three sections prior to the final approach to Bodie in order to negotiate the switchbacks and 3.8% grades. In addition to the problems caused by the sharp turns and steep grades, the rolling stock was not equipped with air rakes. Two brakemen were kept busy hopping from car to car setting the hand brakes whenever the train began to gain momentum. There were many derailments, but no fatalities among the crewmen were ever recorded.

The southern terminus at Mono Mills, while not a large settlement, was a busy one. There were 200 men employed in the wood and lumber business, and the aroma of fresh sawdust was everywhere. Two large boarding houses and six smaller dwellings were located near the mill. The single store supplied all the necessary goods required by the residents, and was operated by Gilchrist, Sharp & Company, who also had 40 mules packing wood, and two large ox teams hauling lots to the mill.

Read more here:
www.explorehistoricalif.com/mono_mills.html
www.rangerovers.net/expeditions/trbb.htm
Nearby cities:
Coordinates:   38°12'35"N   119°0'15"W
This article was last modified 13 years ago