Podilskyi road and metro bridge under construction (Kyiv)
Ukraine /
Kyyiv /
Kiev /
Kyiv
World
/ Ukraine
/ Kyyiv
/ Kiev
, 5 km from center (Київ)
World / Ukraine / Kiev City
road bridge, under construction, metro bridge, 2023_construction
The bridge should connect Northern part of left bank, mainly Troeshchina and Voskresenka (North-East part of the city) with the right bank near Podil, that not so far from the center of the city. The general planned length of the bridge is about 7 km, width — 35 m, height up to 25 m. The bridge would be double-deck with 6 trafic lines on top and metro line on the bottom.
More details on the project please see on www.blagovest.ua/show/article.lisp?id=2787 (in Russian)
More details on the project please see on www.blagovest.ua/show/article.lisp?id=2787 (in Russian)
Wikipedia article: http://en.wikipedia.org/wiki/Podilsko-Voskresensky_Bridge
Nearby cities:
Coordinates: 50°28'31"N 30°32'41"E
- Trukhaniv ostriv metro station (under construction) 0.5 km
- Zatoka Desenka metro station (under construction) 1 km
- Construction Site of Oasis Residential Complex 1.1 km
- Sudnobudivna metro station (under construction) 1.4 km
- Construction Site 1.5 km
- New bridge construction over harbor 1.7 km
- The construction of Parkstone living complex 2.1 km
- Construction site 2.7 km
- School's construction site 3.7 km
- Construction of Obolon Residences complex 5.4 km
- Horbachykha Tract 1.2 km
- Trukhaniv Island 1.2 km
- Dniprovsky park 1.8 km
- Rusanivsky Sady 2 km
- Voskresenski Sady 2.1 km
- Desenka 2.6 km
- Dniprovskyi raion 7.4 km
- Desnianskyi raion 10 km
- Brovary Raion 29 km
- Kaniv Reservoir 48 km