Podilskyi road and metro bridge under construction (Kyiv)

Ukraine / Kyyiv / Kiev / Kyiv
 road bridge, under construction, metro bridge, 2023_construction

The bridge should connect Northern part of left bank, mainly Troeshchina and Voskresenka (North-East part of the city) with the right bank near Podil, that not so far from the center of the city. The general planned length of the bridge is about 7 km, width — 35 m, height up to 25 m. The bridge would be double-deck with 6 trafic lines on top and metro line on the bottom.

More details on the project please see on www.blagovest.ua/show/article.lisp?id=2787 (in Russian)
Nearby cities:
Coordinates:   50°28'31"N   30°32'41"E
This article was last modified 3 years ago