hydroelectric power station/plant
Add category
Tatev
Location: Syunik
Operator: Vorotan Hydroelectric Plants CJSC
Configuration: 3 X 52 MW Pelton
Operation: 1953
T/G supplier: LMZ, Electrosila
EPC: Armhydroenergyproject
Quick facts: This is the first power station in the Vorotan cascade and is supplied by an 18km tunnel. The design head is 552m, the highest in Armenia. Average annual output is about 580 GWh.
Location: Syunik
Operator: Vorotan Hydroelectric Plants CJSC
Configuration: 3 X 52 MW Pelton
Operation: 1953
T/G supplier: LMZ, Electrosila
EPC: Armhydroenergyproject
Quick facts: This is the first power station in the Vorotan cascade and is supplied by an 18km tunnel. The design head is 552m, the highest in Armenia. Average annual output is about 580 GWh.
Wikipedia article: http://en.wikipedia.org/wiki/Tatev_Hydroelectric_Power_Station
Nearby cities:
Coordinates: 39°25'38"N 46°22'15"E
- Roghun Hydroelectric Dam Project Site 2018 km
- Ghazi-Barotha Hydropower Project 2386 km
- Tarbela Dam 2411 km
- Mangla Dam 2533 km
- Pavana Dam 3473 km
- Gadarwara Super Thermal Power Plant 3571 km
- Talakalale Balancing Reservoir 3944 km
- Chakra Reservoir Lake 3987 km
- Balimela Dam Reservoir 4148 km
- POLAVARAM MULTIPURPOSE IRRIGATION PROJECT 4199 km
- Ruins of Old Khot 3.3 km
- Goris Airport 3.4 km
- Mezra 3.8 km
- Goris Municipality 4.1 km
- Shinuhayr mt. 5.4 km
- Wings of Tatev 8.9 km
- Tatev Region 10 km
- Mount Yerabloor 11 km
- Marz of Syunik 22 km
- Qubadli district 23 km