Nakheel Tower (Dubai)

United Arab Emirates / Dubai / Dubai
 construction site  Add category

Location: Nakheel Harbour
Height: 1km+
Developer: Nakheel
Launch: Cityscape Dubai 2008
Previous Proposals: The Pinnacle (The Palm Jumeirah), Al Burj (Dubai Waterfront)
Construction: Foundation works were in progress, but construction stopped because of the financial crisis.
Nearby cities:
Coordinates:   25°3'17"N   55°7'53"E

Comments

  • At 1200m, it will overtake the Burj Dubai as the world's tallest building, when the Al Burj is completed in around 2020.
  • Sorry, I'm mistaken, actually 1400m!
  • the al burj is actully a separate building at dubai waterfront which i dont think they will build because they changed there mind to building this tower in this location on the gateway to jebel ali
  • all of you are wrong no thing will be build because dubai will sink into dust
  • there is no wronge dude just zoom in and see the place been shaped like cyrcle
  • Correct! There's 318 78m x 1.6m skin friction foundation piles in the giant circle that's now been temporarily covered over with sand by the contractors. The liners are in, but yet to pumped, re-enforced or concreted. That's 126 foundation piles more than Burj Khalifa! (Prev - Burj Dubai Tower) Mark my words, this feint circle in the sand is the location of the next world's tallest building by far, in around 2019.
  • Show all comments
This article was last modified 8 years ago