Gorge Hydroelectric Dam

USA / Washington / Marblemount /
 river, dam, hydroelectric power station/plant
 Upload a photo

Construction of Gorge Dam began in 1921 and the first power was delivered to Seattle in 1924. The cost of the dam was $13 million ($153,339,181 in 2006 dollars). In 1961 a new Gorge High Dam was completed (300 feet, 91 meters) to replace the original Gorge Dam.

The Gorge Dam produces 172.7 Megawatts