Rogfast Tunnel

Norway / Rogaland / Tananger /
 under construction, tunnel construction
 Upload a photo

The 27 km tunnel, drilled through rock and left unfinished at a depth of approximately 392 metres, will be an integral part of the E39. The only junction in this tunnel will be the exit for Kvitsoy. Opening scheduled for 2033.
Nearby cities:
Coordinates:   59°6'6"N   5°31'38"E
This article was last modified 5 months ago