Subsidiary of the Russian holding Uralvagonzavod (UVZ).
In 2013, it became known that UVZ was going to open a factory for the production and repair of railway cars in Jelgava. The project was estimated at 20 million euros. It was planned that the construction of the production will be completed at the end of 2014 and at the beginning of 2015 the plant will begin to work, producing about 2 thousand wagons per year. However, in 2015, UVZ announced that the project was frozen.
In 2013, it became known that UVZ was going to open a factory for the production and repair of railway cars in Jelgava. The project was estimated at 20 million euros. It was planned that the construction of the production will be completed at the end of 2014 and at the beginning of 2015 the plant will begin to work, producing about 2 thousand wagons per year. However, in 2015, UVZ announced that the project was frozen.
Nearby cities:
Coordinates: 56°39'1"N 23°45'3"E
- Silnieku Street, 13 34 km
- Kapteiņi 34 km
- Sanatorium 37 km
- Unfinished and abandoned policlinic Ķengarags 39 km
- Mežmalas Street, 1 42 km
- Unfinished Ice Hall 44 km
- New overpass 46 km
- Residental complex Ķeizarmeža krasti 47 km
- Unfinished maternity 47 km
- Unfinished interchange 180 km
- Jelgava-II 0.3 km
- Pārlielupe 0.9 km
- Pasta island 0.9 km
- Prison Jelgava 1.1 km
- Lielupe Meadows 1.2 km
- Langervalde 1.3 km
- Jelgava Railway station 1.4 km
- Station park 1.5 km
- Pils Island 3 km
- Ozolnieki municipality 7.3 km