Cerfontaine Wind farm
Belgium /
Namur /
Philippeville /
World
/ Belgium
/ Namur
/ Philippeville
wind farm, invisible, 2010_construction, do not draw title
11 turbines: Vestas V90/2000 (power 2 MW, diameter 90 m).
Hub height: 78 m.
Total nominal power: 22 MW.
Hub height: 78 m.
Total nominal power: 22 MW.
Nearby cities:
Coordinates: 50°10'29"N 4°29'38"E
- Norther wind farm 189 km
- Thornton Bank wind farm 194 km
- Rentel wind farm 197 km
- Northwind wind farm 201 km
- Belwind Wind Farm 210 km
- THV Mermaid wind farm 215 km
- Noordoostpolder Wind Farm 304 km
- Hornsea 3 Offshore Wind Farm 457 km
- Hornsea One Wind Farm 466 km
- Horns Rev 2 643 km
- Senzeille castle 2.3 km
- Castle-farm of Roly 5.5 km
- Philippeville (Municipality) 7.9 km
- Fagnolle Castle 8.9 km
- Carmeuse Group 10 km
- Boussu castle 11 km
- Licot castle 12 km
- Sint-Roch castle 13 km
- Viroinval 17 km
- Chimay (Municipality) 20 km