Travad Wind farm

Sweden / Vastra Gotaland / Lidkoping /
 wind farm, 2012_construction
 Upload a photo

3 turbines: Kenersys K100 (power 2.5 MW, diameter 100 m).
Hub height: 100 m.
Total nominal power: 7.5 MW.
Nearby cities:
Coordinates:   58°14'10"N   13°4'15"E
This article was last modified 6 years ago