Zongo II Hydroelectric Power Station

Congo (Dem. Rep.) / Bas-Congo / Kasangulu /
 hydroelectric power station/plant  Add category
 Upload a photo

Installed capacity of 150 MW (three turbines).
Nearby cities:
Coordinates:   4°46'46"S   14°52'4"E

Comments

  • Inaugrated in 2018 https://www.afrik21.africa/en/drc-sinohydro-has-finally-completed-the-zongo-2-hydroelectric-dam/
  •  66 km
  •  81 km
  •  337 km
  •  480 km
  •  484 km
  •  711 km
  •  756 km
  •  876 km
  •  887 km
  •  1362 km
This article was last modified 7 years ago