Barry Docks Solar Farm
United Kingdom /
Wales /
Barry /
World
/ United Kingdom
/ Wales
/ Barry
solar farm
Add category
In June 2014 it was reported that the Vale of Glamorgan Council had ruled that there was no need for an extensive environmental assessment of a solar farm planned by ABP for an unused part of the dock. The solar farm would be built on two brownfield sites and would cover a 51 acres (21 ha). Power would be delivered direct to businesses in and around the port, with the surplus fed into the grid. The £5M solar farm was in fact constructed and the 20-acre site was operational by August 2015 and can provide 4.5MWh of electricity.
Wikipedia article: https://en.wikipedia.org/wiki/Barry_Docks#Commercial_operations
Nearby cities:
Coordinates: 51°23'44"N 3°15'17"W
- Hillhouse Solar Field 72 km
- Bradenstoke Solar Field 87 km
- Wroughton Solar Field 101 km
- Eveley Solar Field 124 km
- Landmead Solar Field 133 km
- Brayton Manor Solar Field 135 km
- Odell Glebe Solar Field 205 km
- Glebe Solar Farm 206 km
- Chelveston Renewable Energy Park 213 km
- Bury Lane Solar Field 236 km
- Barry Island 1.5 km
- Cardiff International Airport / Maes Awyr Rhyngwladol Caerdydd 6.2 km
- Aberthaw Cement Works Blue Lias Quarry 8.7 km
- Aberthaw Power Station 10 km
- Saint Athan Airport 13 km
- Bridgwater Bay 16 km
- Butlins - Minehead 26 km
- Somerset 30 km
- Exmoor National Park 41 km
- Bristol Channel 48 km