Massachusetts Military Reservation Wind Project
USA /
Massachusetts /
Sagamore /
World
/ USA
/ Massachusetts
/ Sagamore
wind farm
Add category
Massachusetts Military Reservation Wind Project is located in Barnstable County, Massachusetts on the Massachusetts Military Reservation (MMR), also known as the Joint Base Cape Cod. It consists of one Fuhrländer 1500/77 (1.5MW) wind turbine erected in 2009 and located in the southern sector of the base (not included in this outline), two GE Energy 1.5sle (1.5MW) wind turbines erected in 2011 (the northern two within this outline) and two GE Energy 1.6-82.5 (1.6MW) turbines constructed in 2014 (the southern two). These five turbines have a combined nominal capacity of 7.7 MW.
Nearby cities:
Coordinates: 41°45'22"N 70°32'41"W
- Niagara Region Wind Farm 759 km
- Grand Renewable Wind Farm 783 km
- Mesgi’g Ugju’s’n Wind Farm 793 km
- Summerhaven Wind Energy Centre 798 km
- Port Burwell Wind Farm 860 km
- Goshen Wind Farm 938 km
- K2 Wind Farm 944 km
- South Kent Wind Farm 984 km
- Gratiot Wind Park 1165 km
- Lee-DeKalb Wind Energy Center 1528 km
- Cape Cod Canal 1 km
- Joint Base Cape Cod (Massachusetts Military Reservation) 5.6 km
- Monument Beach 6.6 km
- Mashpee-Wakeby Pond 11 km
- Wings Neck 11 km
- Otis Air National Guard Base (FMH/KFMH) 11 km
- Pocasset, Massachusetts 11 km
- Wareham, Massachusetts 13 km
- Town of Plymouth 17 km
- Town of Falmouth, Massachusetts 20 km