Massachusetts Military Reservation Wind Project

USA / Massachusetts / Sagamore /
 wind farm  Add category
 Upload a photo

Massachusetts Military Reservation Wind Project is located in Barnstable County, Massachusetts on the Massachusetts Military Reservation (MMR), also known as the Joint Base Cape Cod. It consists of one Fuhrländer 1500/77 (1.5MW) wind turbine erected in 2009 and located in the southern sector of the base (not included in this outline), two GE Energy 1.5sle (1.5MW) wind turbines erected in 2011 (the northern two within this outline) and two GE Energy 1.6-82.5 (1.6MW) turbines constructed in 2014 (the southern two). These five turbines have a combined nominal capacity of 7.7 MW.
Nearby cities:
Coordinates:   41°45'22"N   70°32'41"W
This article was last modified 8 years ago