Colebrook South Wind Farm
USA /
Connecticut /
Winchester /
World
/ USA
/ Connecticut
/ Winchester
wind farm
Add category
Colebrook South wind farm is located just south of Hwy 44, about 5 miles northwest of the town of Winsted, Connecticut. Commissioned in 2015, it consists of 2 GE Energy 2.85-103 wind turbines with a combined nominal capacity of 5.7 MW. A third permitted turbine on the site has not (yet?) been built.
Wikipedia article: https://en.wikipedia.org/wiki/Wind_power_in_Connecticut#Connecticut_Wind_Colebrook_Project
Nearby cities:
Coordinates: 41°57'48"N 73°8'43"W
- Niagara Region Wind Farm 545 km
- Grand Renewable Wind Farm 568 km
- Summerhaven Wind Energy Centre 583 km
- Port Burwell Wind Farm 644 km
- Goshen Wind Farm 724 km
- K2 Wind Farm 734 km
- South Kent Wind Farm 767 km
- Mesgi’g Ugju’s’n Wind Farm 868 km
- Gratiot Wind Park 950 km
- Lee-DeKalb Wind Energy Center 1311 km
- Norfolk, Connecticut 4.4 km
- Winchester, Connecticut 6.1 km
- Colebrook, Connecticut 6.7 km
- Canaan, Connecticut 13 km
- Goshen, Connecticut 15 km
- Mohawk State Forest 20 km
- Cornwall, Connecticut 21 km
- Litchfield County, Connecticut 23 km
- Housatonic Meadows State Park 24 km
- Macedonia Brook State Park 36 km