777X Composite Wing Plant (Everett, Washington)

USA / Washington / Mukilteo / Everett, Washington
 production, aircraft manufacturer
 Upload a photo

Presently under construction and slated for completion in 2016, this future 1.3-million-square-foot building will be the primary manufacturing site for the Carbon Composite Wings slated for use by the future 777X twin engine airliner, which will measure 114 feet long and 23 feet wide and will feature folding tips to permit operations in confined airport space.

The facility is slated to begin production of in 2017, with the first 777X due to enter commercial service in 2020.

www.theheraldbusinessjournal.com/article/20140218/BIZ/1...
www.bizjournals.com/seattle/news/2014/12/16/boeings-1-b...
www.theheraldbusinessjournal.com/article/20141021/BIZ/1...
Nearby cities:
Coordinates:   47°55'46"N   122°16'13"W
This article was last modified 4 years ago