Kārļu Aizsprosta Hydroelectric Power Plant
Latvia /
Cesu /
Cesis /
World
/ Latvia
/ Cesu
/ Cesis
dam, hydroelectric power station/plant

Small hydroelectric power plant, which produces 2500 MWh of electricity. Capacity - 0.6 MW.
Built in 2002. Was spent 280 000 LVL (≈ 398 405 EUR) for the construction.
Built in 2002. Was spent 280 000 LVL (≈ 398 405 EUR) for the construction.