PLTU - Cahaya Fajar Kaltim 2 x 25MW
Indonesia /
Kalimantan Timur /
Samarinda /
World
/ Indonesia
/ Kalimantan Timur
/ Samarinda
office building, production

Steam Coal Power Plant : Pembangkit Listrik Tenaga Uap (PLTU)
Capacity PLTU CFK :
1. 2 x 25MW (existing)
2. 1 x 50MW (Plan)
Location : Tanjung Batu - Desa Embalut - Tenggarong Seberang
foursquare.com/v/pembangkit-cfk/51942af4498ef5456ee1148...
Capacity PLTU CFK :
1. 2 x 25MW (existing)
2. 1 x 50MW (Plan)
Location : Tanjung Batu - Desa Embalut - Tenggarong Seberang
foursquare.com/v/pembangkit-cfk/51942af4498ef5456ee1148...
Nearby cities:
Coordinates: -0°22'9"N 117°3'48"E
- Coal Concessions 30 km
- Semberah Oil & Gas Field 36 km
- Sumalindo Hutani Jaya 2 36 km
- PT. PUTRA PERKASA INDAH 38 km
- ABN Petrosea Project 40 km
- SANTAN TERMINAL - CHEVRON INDONESIA COMPANY 53 km
- KAJM_Concession 61 km
- Fish Ponds 65 km
- BJPE - Bumi Jaya Prima Etam 90 km
- BRP 260 km
- Kecamatan Tenggarong 7.9 km
- Kecamatan Samarinda Ulu 10 km
- Kecamatan Sungai Kunjang 17 km
- Sapto 3 Loa Buah, Loa Bakung, Lok Bahu 18 km
- U/N Coal Minning 33 km
- PT. APK Coal Minning 34 km
- U/N Coal Minning 38 km
- PT. PPA Coal Mines 41 km
- Taman Hutan Raya Bukit Suharto 51 km
- KSM 56 km