dam, hydroelectric power station/plant, road bridge
Construction of the weir and its offtakes began early in 1935 and was completed in 1939. The water impounded by the Yarrawonga Weir forms Lake Mulwala, which has a capacity of 117,500 ML.
A hydro-electric generation facility at Yarrawonga Weir was commissioned in June 1994. The facility has a maximum capacity of about 9.6 MW.
www.g-mwater.com.au/water-resources/catchments/storages...
www.mdba.gov.au/publications/mdba-reports/hume-dam-yarr...
A hydro-electric generation facility at Yarrawonga Weir was commissioned in June 1994. The facility has a maximum capacity of about 9.6 MW.
www.g-mwater.com.au/water-resources/catchments/storages...
www.mdba.gov.au/publications/mdba-reports/hume-dam-yarr...
Nearby cities:
Coordinates: 36°0'31"S 145°59'57"E
- Barooga Bridge. 30 km
- Road bridge 49 km
- Road bridge 50 km
- Road bridge 56 km
- Monash Bridge 61 km
- Road bridge 64 km
- Road bridge 64 km
- Road bridge 67 km
- Goulburn River Bridge 79 km
- Road bridge 79 km
- Golf Course 1.1 km
- Thales ( ADI ) munitions factory 3 km
- Yarrawonga Airport (YYWG) 3.6 km
- Lake Mulwala 8.8 km
- Cobrawonga Island, Murray River 21 km
- Dynson Block 28 km
- Cobram/Barrooga Golf courses 31 km
- Tocumwal Airport (YTOC) 42 km
- Tocumwal Golf Course 43 km
- Mairjimmy State Forest 63 km