LNG Canada Phase 2 Terminal Site

Canada / British Columbia / Kitimat /
 seaport, under construction, natural gas industry, LNG liquifaction plant
 Upload a photo

This location at Bish Cove is where Phase 2 of the Kitimat LNG Canada project is proposed. Phase 1 was built from 2019-2025 on industrial lands near Kitimat. Phase 2 would entail 2 electric-drive Natural Gas Liquifaction Trains with a combined output capacity of 14 MTPA (million tonnes per annum) at Bish Cove. Phase 3 would add a third train at Bish Cove to increase output here to 18 MTPA.
Nearby cities:
Coordinates:   53°55'27"N   128°45'2"W
This article was last modified 6 months ago