Nepean Nickel Mine/Project
Australia /
Western Australia /
Kalgoorlie-Boulder /
World
/ Australia
/ Western Australia
/ Kalgoorlie-Boulder
World / Australia / Western Australia
mine
Add category
The Nepean Project is centred on the historic Nepean Nickel Mine, which produced 32,303 tonnes of mined nickel at an average recovered grade of 2.99% Ni over a 17 year period to 1987.
The current inferred resource based on the mine’s remnant, transitional and fresh mineralisation measures 591,300t @ 2.2% Ni, for 13,250t contained Ni.
In addition to the historical mine, which remains open at depth, the Nepean tenement package incorporates a 30km strike length of Kambalda-style komatiites with significant nickel sulphide mineralisation potential. This potential was identified by mapping, VTEM, detailed aerial magnetics and drilling along sections of the strike length.
A Bankable Feasibility Study comprising grade control infill drilling, mine design and processing engineering studies was completed in 2008 but due to sustained decline in the nickel price over recent times, Focus took the commercial decision to defer commencement of full-scale operations until the nickel price outlook improves. Nepean remains a strategic nickel asset which is strongly leveraged to a recovery in the nickel price.
Reference for information:
www.focusminerals.com.au/Projects/NepeanProject.aspx
Reference for location:
bonzle.com/c/a?a=p&p=776&nudge=1&c=3&x=121%2E0819237895...
The current inferred resource based on the mine’s remnant, transitional and fresh mineralisation measures 591,300t @ 2.2% Ni, for 13,250t contained Ni.
In addition to the historical mine, which remains open at depth, the Nepean tenement package incorporates a 30km strike length of Kambalda-style komatiites with significant nickel sulphide mineralisation potential. This potential was identified by mapping, VTEM, detailed aerial magnetics and drilling along sections of the strike length.
A Bankable Feasibility Study comprising grade control infill drilling, mine design and processing engineering studies was completed in 2008 but due to sustained decline in the nickel price over recent times, Focus took the commercial decision to defer commencement of full-scale operations until the nickel price outlook improves. Nepean remains a strategic nickel asset which is strongly leveraged to a recovery in the nickel price.
Reference for information:
www.focusminerals.com.au/Projects/NepeanProject.aspx
Reference for location:
bonzle.com/c/a?a=p&p=776&nudge=1&c=3&x=121%2E0819237895...
Nearby cities:
Coordinates: 31°9'42"S 121°5'15"E
- Kundana Gold Mine 54 km
- St. Ives Gold Mine 61 km
- Mount Pleasant Gold Mine 74 km
- Paddington Gold Mine 80 km
- Cawse Nickel Mine 93 km
- Mount Jackson Iron Ore Mine 205 km
- Sunrise Dam Mine 266 km
- Murrin Murrin Nickel-Cobalt Mine 279 km
- Mount Keith 443 km
- Tuckabianna Project 517 km
- Mt Marion 37 km
- WMC Nickel Smelter 50 km
- Kalgoorlie-Boulder Airport YPKG 55 km
- Kalgoorlie Superpit 58 km
- Lake Lefroy 64 km
- Lake Zot 76 km
- Challenger/Swordsman Mine 95 km
- Higgensville Mine 95 km
- Yindarlgooda Lake 108 km
- Lake Cowan 114 km