Tista Road Bridge
Bangladesh /
Lalmanir Hat /
World
/ Bangladesh
/ Lalmanir Hat
/ Lalmanir Hat
World / Bangladesh / Rajshahi / Ranpur / Rongpur
road bridge
Add category
Construction of the 750-metre-long and 12-and-a-half-metre-wide bridge had began in 2006 at an estimated cost of Tk 1.22-billion. It was scheduled for completion in 2009. Govt has now expressed hope that it would be completed and opened to traffic by June-July 2012.