Units 1 & 2 (state-owned)
Indonesia /
Jawa Timur /
Besuki /
World
/ Indonesia
/ Jawa Timur
/ Besuki
World / Indonesia / Jawa Timur
thermal power station
Add category
Part of Paiton thermal power stations. Owned by PT Pembangkitan Jawa Bali Unit Paiton, which in turn is subsidiary of state-owned Perusahaan Listrik Negara.
The units generates 800 megawatts, 400 megawatt each.
The units generates 800 megawatts, 400 megawatt each.
Nearby cities:
Coordinates: 7°42'54"S 113°35'4"E
- Tanjung Jati B thermal power plant 347 km
- PLTU Cilacap 497 km
- PLTU Cirebon 2 558 km
- Cirebon 1 thermal power plant 559 km
- Indramayu thermal power station 641 km
- Banten 3 thermal power station 809 km
- Tarong Power Station 4563 km
- Mount Piper Power Station 4708 km
- Wallerawang Power Station 4715 km
- Eraring Power Station, New South Wales 4815 km
- Paiton thermal power stations 0.6 km
- Ash Disposal Area 1.9 km
- Paiton District 7.1 km
- Mag: 4.1 Earthquake Epicenter 11 km
- Tanjung Ketah 14 km
- Mt. Siluman (1.770 m) 15 km
- Desa Dawuhan 16 km
- Mt. Malang 19 km
- Bungatan Bay 20 km
- Baderan, Start point to Argopuro 22 km