Finsch Diamond Mine
South Africa /
Northern Cape /
Danielskuil /
World
/ South Africa
/ Northern Cape
/ Danielskuil
World / South Africa / Northern Cape
kimberlite pipe
Add category
Producer of: Diamonds
Location: 160km northwest of Kimberley, Cape Province, South Africa
Ownership: Previously De Beers Consolidated Mines Ltd (100%) but was sold in 2011 to Petra Diamonds Limited.
Geology type: Kimberlite pipe hosted in banded ironstones
Mineral type: Diamonds, mainly industrial
Reserve base: 105.5Mt containing 45Mct (probable, indicated and inferred)
Annual productionCapacity: 6Mt/y run-of-mine ore; 2.2Mct (2005)
The Finsch diamond mine, located near Lime Acres, 160km northwest of Kimberley, is one of seven operations managed by De Beers Consolidated Mines (DBCM), formed in July 2004 as the wholly owned South African mining subsidiary of Luxembourg-based DB Investments / De Beers SA. This restructuring created a company that can be empowered under the terms of South Africa’s Mineral & Petroleum Resources Development Act.
Discovered in 1961 during exploration for asbestos, the deposit was first developed as an open pit. Since 1991, production has come from the underground mine beneath the old pit. Production in 2005 totalled 2.22Mct – 15% of DBCM’s total output – from 5.94Mt of kimberlite ore, giving a recovered grade of 37.3 carats per 100t of ore. Employees numbered 1,319 at the year-end.
Geology
Finsch is a classic diamondiferous kimberlite pipe, which has a surface expression of around 17.9ha. The country rocks consist of banded ironstones overlying dolomites and limestones, the pipe itself consisting of weathered kimberlite (yellow ground) to a depth of around 100m with unweathered material (blue ground) beneath.
Reserves at Finsch are sufficient to maintain mining at current rates for a further 27 years.
Mining
The underground mine is accessed via a spiral decline from surface to the 680m level and a 9m-diameter, 763m-deep shaft equipped with three automatic Koepe hoists and capable of handling 5Mt/y of ore. Underground development began in 1978 and the shaft was commissioned in 1982.
The upper levels of the underground mine use a sub-level open stoping system. The ore and waste is moved from the production levels via vertical ore passes that feed the material to the crushers. The ore is then transported by belt conveyor to the shaft systems for hoisting to the surface.
"In November 2005, Finsch started using an automated ore-transport system underground, costing $18.5m to install."Production from the open-stope blocks 2 and 3 on the 430m and 510m levels below surface is being replaced by a block-caving system in block 4 on the 630m level that will reach full production of 3.8Mt/y of ore between 2007 and 2011. This will be depleted by 2015, with block 5 beneath following it into production in 2014.
Stope development utilises ore passes raise-bored to 2.9m diameter, then opened out to 6m diameter using a sliping rig that fits within the ore pass to drill the full profile. Semi-automated Tamrock drill rigs are used for drilling production rings in the open stopes. Rings consist of 102mm-diameter holes up to 45m long, through a full 360°. Dry drilling is used because of the weathering characteristics of the kimberlite.
Finsch makes use of specially developed, repumpable emulsion explosives, blended from components mixed underground and placed using dedicated transport and charging vehicles. The emulsion is sufficiently viscous to be pumped up 102mm vertical holes and to remain in position, and is inert until primed during charging.
Benefits of this system include reduced carbon monoxide and nitrogen oxide emissions after blasting, and reduced explosive usage in fewer holes per ring. Detonation is controlled from the blasting cubicle in the underground production centre, with precise timing achieved by individually programmed microchip detonators.
12t-capacity LHDs dump broken ore into Finsch’s eight ore passes, each of which has a capacity of 10,000t. MMD sizers reduce the kimberlite to –300mm for transport to the shafts and hoisting to surface. In November 2005, Finsch started using an automated ore-transport system underground, costing $18.5m to install.
Centred on a specially built, high-speed, high-strength concrete road, 630m below surface, this marked a world first for underground mining in relation to fully automated trucking.
Communications
Since 1988, Finsch has used an underground vehicle management and communication system. This was upgraded in 1995 to an El-Equip MultiCom radio-controlled data transfer system based on leaky feeder technology. The system permits multi-channel voice and data transmission. The position of LHDs underground is monitored using Modular Mining Systems’ dispatch system, the controller on surface instructing the individual machines where to load and dump through the mine-wide communications network.
Diamond recovery
Run-of-mine ore is crushed and screened, while –18mm and –3mm material is processed separately. Dense-medium separation is used for the coarser ore, while the fine material is processed through a pan plant and by high-intensity magnetic separation. The concentrates are retreated in cyclones to reduce the volume further, then combined and dried to form the feed for X-ray fluorescence sorting to recover the diamonds.
"Underground development began in 1978 and the shaft was commissioned in 1982."Tailings are passed over grease belts to retain any residual stones. Between February 2005 and end-September 2006, the engineering firm, Bateman, carried out a major upgrade of the technology, also increasing the feed rate to the plant to 900t/h.
To enhance the diamond recovery rate, an upgrade to the Finsch treatment plant was completed in July 2008. The R630m upgrade has increased throughput capacity by 1.4Mt/y.
---------------------------------------------
De Beers Announces Sale of Finsch Diamond Mine
21st January, 2011
De Beers Consolidated Mines (“DBCM”) today announced that it has entered into an agreement with Petra Diamonds Limited (“Petra”) to sell Finsch Diamond Mine (“Finsch”) as a going concern for a consideration of R1.425 billion (approximately US$200 million) payable in cash. Petra has formed an empowerment consortium to acquire the Mine.
De Beers announces sale of Finsch Diamond MineFINAL (PDF, 33KB)
The agreement to sell the mine to a Petra company follows an open and rigorous selection process that evaluated prospective bidders on a number of criteria determined by DBCM as critical to ensuring the long-term sustainability of Finsch. In addition to Petra’s access to funding, criteria included a detailed evaluation of the company’s technical capacity, a proven track record in South Africa, broad-based BEE credentials, and a strong socio-economic focus.
Commenting on the sale, Barend Petersen, Chairman of DBCM said: “We are particularly pleased to have been able to conclude this transaction with Petra. Their track record as a hardrock underground diamond miner bodes well for the long-term sustainability of Finsch going forward, and we are confident that this will help ensure continued investment in the town of Lime Acres and the Northern Cape for many years to come. Perhaps most importantly, today’s announcement brings together a significant pool of employee and women’s organizations and local participation that will ensure that a wide range of empowerment groups will benefit form the mine’s future success.”
Phillip Barton, CEO of DBCM said: “The sale of Finsch Mine reflects the continuing evolution of DBCM’s mining portfolio. It will enable us to prioritise capital to invest in growth opportunities that best suit our criteria, and to sustain a strong diamond mining business in South Africa for the future. In this way DBCM is strengthening its commercial future in South Africa whilst helping to meet Government’s aspirations for a diversified and transformed South African diamond industry.”
DBCM will continue to manage Finsch as normal until such time as the sale, which is subject to a number of conditions precedent, has been finalised. Conditions include obtaining the necessary approvals from the Competition Tribunal, as well as the successful transfer of DBCM’s new order mining right to Petra.
“De Beers has a lot to be proud of at Finsch Mine – a dedicated workforce, a world class safety record and a well managed environmental programme. A new investor will be able to realise the longer term potential of the Mine, and thereby contribute to sustaining economic activity in the Lime Acres region of the Northern Cape.” concluded Barend Petersen.
Reference for information:
www.mining-technology.com/projects/finsch/
www.debeersgroup.com/en/Exploration-and-mining/Mining-o...
www.debeersgroup.com/en/Media-centre/Press-releases/201...
Location: 160km northwest of Kimberley, Cape Province, South Africa
Ownership: Previously De Beers Consolidated Mines Ltd (100%) but was sold in 2011 to Petra Diamonds Limited.
Geology type: Kimberlite pipe hosted in banded ironstones
Mineral type: Diamonds, mainly industrial
Reserve base: 105.5Mt containing 45Mct (probable, indicated and inferred)
Annual productionCapacity: 6Mt/y run-of-mine ore; 2.2Mct (2005)
The Finsch diamond mine, located near Lime Acres, 160km northwest of Kimberley, is one of seven operations managed by De Beers Consolidated Mines (DBCM), formed in July 2004 as the wholly owned South African mining subsidiary of Luxembourg-based DB Investments / De Beers SA. This restructuring created a company that can be empowered under the terms of South Africa’s Mineral & Petroleum Resources Development Act.
Discovered in 1961 during exploration for asbestos, the deposit was first developed as an open pit. Since 1991, production has come from the underground mine beneath the old pit. Production in 2005 totalled 2.22Mct – 15% of DBCM’s total output – from 5.94Mt of kimberlite ore, giving a recovered grade of 37.3 carats per 100t of ore. Employees numbered 1,319 at the year-end.
Geology
Finsch is a classic diamondiferous kimberlite pipe, which has a surface expression of around 17.9ha. The country rocks consist of banded ironstones overlying dolomites and limestones, the pipe itself consisting of weathered kimberlite (yellow ground) to a depth of around 100m with unweathered material (blue ground) beneath.
Reserves at Finsch are sufficient to maintain mining at current rates for a further 27 years.
Mining
The underground mine is accessed via a spiral decline from surface to the 680m level and a 9m-diameter, 763m-deep shaft equipped with three automatic Koepe hoists and capable of handling 5Mt/y of ore. Underground development began in 1978 and the shaft was commissioned in 1982.
The upper levels of the underground mine use a sub-level open stoping system. The ore and waste is moved from the production levels via vertical ore passes that feed the material to the crushers. The ore is then transported by belt conveyor to the shaft systems for hoisting to the surface.
"In November 2005, Finsch started using an automated ore-transport system underground, costing $18.5m to install."Production from the open-stope blocks 2 and 3 on the 430m and 510m levels below surface is being replaced by a block-caving system in block 4 on the 630m level that will reach full production of 3.8Mt/y of ore between 2007 and 2011. This will be depleted by 2015, with block 5 beneath following it into production in 2014.
Stope development utilises ore passes raise-bored to 2.9m diameter, then opened out to 6m diameter using a sliping rig that fits within the ore pass to drill the full profile. Semi-automated Tamrock drill rigs are used for drilling production rings in the open stopes. Rings consist of 102mm-diameter holes up to 45m long, through a full 360°. Dry drilling is used because of the weathering characteristics of the kimberlite.
Finsch makes use of specially developed, repumpable emulsion explosives, blended from components mixed underground and placed using dedicated transport and charging vehicles. The emulsion is sufficiently viscous to be pumped up 102mm vertical holes and to remain in position, and is inert until primed during charging.
Benefits of this system include reduced carbon monoxide and nitrogen oxide emissions after blasting, and reduced explosive usage in fewer holes per ring. Detonation is controlled from the blasting cubicle in the underground production centre, with precise timing achieved by individually programmed microchip detonators.
12t-capacity LHDs dump broken ore into Finsch’s eight ore passes, each of which has a capacity of 10,000t. MMD sizers reduce the kimberlite to –300mm for transport to the shafts and hoisting to surface. In November 2005, Finsch started using an automated ore-transport system underground, costing $18.5m to install.
Centred on a specially built, high-speed, high-strength concrete road, 630m below surface, this marked a world first for underground mining in relation to fully automated trucking.
Communications
Since 1988, Finsch has used an underground vehicle management and communication system. This was upgraded in 1995 to an El-Equip MultiCom radio-controlled data transfer system based on leaky feeder technology. The system permits multi-channel voice and data transmission. The position of LHDs underground is monitored using Modular Mining Systems’ dispatch system, the controller on surface instructing the individual machines where to load and dump through the mine-wide communications network.
Diamond recovery
Run-of-mine ore is crushed and screened, while –18mm and –3mm material is processed separately. Dense-medium separation is used for the coarser ore, while the fine material is processed through a pan plant and by high-intensity magnetic separation. The concentrates are retreated in cyclones to reduce the volume further, then combined and dried to form the feed for X-ray fluorescence sorting to recover the diamonds.
"Underground development began in 1978 and the shaft was commissioned in 1982."Tailings are passed over grease belts to retain any residual stones. Between February 2005 and end-September 2006, the engineering firm, Bateman, carried out a major upgrade of the technology, also increasing the feed rate to the plant to 900t/h.
To enhance the diamond recovery rate, an upgrade to the Finsch treatment plant was completed in July 2008. The R630m upgrade has increased throughput capacity by 1.4Mt/y.
---------------------------------------------
De Beers Announces Sale of Finsch Diamond Mine
21st January, 2011
De Beers Consolidated Mines (“DBCM”) today announced that it has entered into an agreement with Petra Diamonds Limited (“Petra”) to sell Finsch Diamond Mine (“Finsch”) as a going concern for a consideration of R1.425 billion (approximately US$200 million) payable in cash. Petra has formed an empowerment consortium to acquire the Mine.
De Beers announces sale of Finsch Diamond MineFINAL (PDF, 33KB)
The agreement to sell the mine to a Petra company follows an open and rigorous selection process that evaluated prospective bidders on a number of criteria determined by DBCM as critical to ensuring the long-term sustainability of Finsch. In addition to Petra’s access to funding, criteria included a detailed evaluation of the company’s technical capacity, a proven track record in South Africa, broad-based BEE credentials, and a strong socio-economic focus.
Commenting on the sale, Barend Petersen, Chairman of DBCM said: “We are particularly pleased to have been able to conclude this transaction with Petra. Their track record as a hardrock underground diamond miner bodes well for the long-term sustainability of Finsch going forward, and we are confident that this will help ensure continued investment in the town of Lime Acres and the Northern Cape for many years to come. Perhaps most importantly, today’s announcement brings together a significant pool of employee and women’s organizations and local participation that will ensure that a wide range of empowerment groups will benefit form the mine’s future success.”
Phillip Barton, CEO of DBCM said: “The sale of Finsch Mine reflects the continuing evolution of DBCM’s mining portfolio. It will enable us to prioritise capital to invest in growth opportunities that best suit our criteria, and to sustain a strong diamond mining business in South Africa for the future. In this way DBCM is strengthening its commercial future in South Africa whilst helping to meet Government’s aspirations for a diversified and transformed South African diamond industry.”
DBCM will continue to manage Finsch as normal until such time as the sale, which is subject to a number of conditions precedent, has been finalised. Conditions include obtaining the necessary approvals from the Competition Tribunal, as well as the successful transfer of DBCM’s new order mining right to Petra.
“De Beers has a lot to be proud of at Finsch Mine – a dedicated workforce, a world class safety record and a well managed environmental programme. A new investor will be able to realise the longer term potential of the Mine, and thereby contribute to sustaining economic activity in the Lime Acres region of the Northern Cape.” concluded Barend Petersen.
Reference for information:
www.mining-technology.com/projects/finsch/
www.debeersgroup.com/en/Exploration-and-mining/Mining-o...
www.debeersgroup.com/en/Media-centre/Press-releases/201...
Wikipedia article: http://en.wikipedia.org/wiki/Finsch_diamond_mine
Nearby cities:
Coordinates: 28°23'14"S 23°26'55"E
- Cullinan Diamond Mine 586 km
- Letlhakane Diamond Mine 800 km
- Damtshaa Diamond Mine 816 km
- Venetia Diamond Mine 887 km
- River Ranch Diamond Mine 948 km
- Catoca Diamond Mine 2144 km
- Koidu Kimberlite mine 5539 km
- Карьер Юбилейный 12786 km
- Mir Diamond Mine 12823 km
- Udachnaya pipe 12844 km
- Large hole in the ground 0.5 km
- PPC Lime Acres 5.8 km
- Jasper Solar Energy Project 12 km
- beadle 13 km
- Tsantsabane 43 km
- Anglo American Kolomela Mine 52 km
- Breipaal 79 km
- Bongani 82 km
- Kwartelspan diamond mine 106 km
- Greefspan Solar power plant 112 km