Sludge Digester Tanks (Los Angeles, California)

USA / California / El Segundo / Los Angeles, California
 wastewater treatment plant  Add category
 Upload a photo

there are 20 2.5 million gallon digestors

Bacteria and heat (128 degrees F) are used to destroy pathogens

Sludge takes 15 days to pass through here.

Methane gas byproduct is used to power the facility.
Nearby cities:
Coordinates:   33°55'43"N   118°25'49"W

Comments

  • ES... "where the sewer meets the sea"
  • Treated water does not actually make it to the sea.
  • dozlr, it does after going through secondary treatment.
  • the digester temperature is 128 F, not 120 F.
This article was last modified 14 years ago