The decision to replace the Old Victoria Dam was made in 1989. Use of the old dam for water supply ended on 3 April 1990, and the old dam was partially demolished. Construction on the new dam started on 23 August 1990.
The new Victoria Dam wall was constructed just upstream from the old dam using roller-compacted concrete (RCC), rather than the more traditional method of large concrete pours or earthfill. It was the first dam built in Western Australia using this method, and at the time was the largest of this type built in Australia. Also, instead of using cement in the RCC, fly ash from the Muja Coal Power Station was used, which reduced costs and minimized the heat produced during the hardening of the concrete.
The new Victoria Dam wall was constructed just upstream from the old dam using roller-compacted concrete (RCC), rather than the more traditional method of large concrete pours or earthfill. It was the first dam built in Western Australia using this method, and at the time was the largest of this type built in Australia. Also, instead of using cement in the RCC, fly ash from the Muja Coal Power Station was used, which reduced costs and minimized the heat produced during the hardening of the concrete.
Nearby cities:
Coordinates: 32°2'45"S 116°4'28"E
- Mundaring Weir Museum 13 km
- Canning Dam 13 km
- Wungong Dam 17 km
- Serpentine Dam 40 km
- Dirk Brook Dam 44 km
- North Dandalup Dam 51 km
- Harvey dam 115 km
- Harris Dam 134 km
- Glen Mervyn Dam 161 km
- Marloo Dam 981 km
- Orange Grove 4.4 km
- Lesmurdie 5.4 km
- Roleystone 7.5 km
- Gosnells 8.7 km
- Forrestfield 9 km
- Greater Perth, WA 12 km
- Shire of Serpentine-Jarrahdale 31 km
- Gooralong Reserve 33 km
- Huntly Bauxite Mine 62 km
- Shire of Murray 65 km