Iligan City Circumferential Road C3 (Iligan City)

 Upload a photo

The C-3 will span approximately 18.055 kilometers. Phase I has a length of 10.651 kms. and Phase II has a total length of 7.404 kms (Phase II-A = 1.084 kms, Phase II-B = 4.5 kms., Phase II-C = 1.820 kms.) It will involve the construction of five bridges (Pugaan, Merila, Tominobo, Sta. Elena and Nonucan). It will be a two-lane, 6.70 meters wide paved highway with 3 meters shoulder and 30 meters road-right-of-way.
Picture
Phase I will begin at Mandulog Bridge I, Barangay Hinaplanon, and traverses Barangays Luinab, Del Carmen, Pala-o, Puga-an, Ubaldo Laya, Tubod and Tomas Cabili and ends at Macapagal Avenue (National Highway) fronting the NSC Compound. Phase II-A will start at the junction of the Iligan-Bukidnon Road at Barangay San Roque and ends at Mandulog Bridge I. Phase II-B will start at Scion Road at Barangay Tomas Cabili and traverses Barangay Suarez and will connect to old road going to Marawi City then down to national highway at Nonucan. Phase II-C begins after the proposed Suarez Bridge (Nonucan) and connects to old road to Marawi City then ascends to the present national highway to Marawi City at Barangay Ma. Cristina.
Nearby cities:
Coordinates:   8°12'24"N   124°14'25"E
  •  15 km
  •  42 km
  •  69 km
  •  85 km
  •  135 km
  •  163 km
  •  226 km
  •  233 km
  •  240 km
  •  705 km
This article was last modified 12 years ago