Pelješac Bridge

Croatia / Dubrovnik-Neretva / Opuzen /
 road bridge, cable-stayed bridge

The bridge is intended to connect the Croatian peninsula of Pelješac, and through it the southernmost part of Croatia including Dubrovnik, with the Croatian mainland, while avoiding crossing Bosnia and Herzegovina at the Neum Corridor.
Construction started on 30 July 2018, and the bridge was joined together on 28 July 2021. The bridge and its access roads opened for traffic on 26 July 2022.
Nearby cities:
Coordinates:   42°55'54"N   17°32'7"E
  •  123 km
  •  207 km
  •  215 km
  •  293 km
  •  293 km
  •  309 km
  •  316 km
  •  325 km
  •  330 km
  •  350 km