Pelješac Bridge
Croatia /
Dubrovnik-Neretva /
Opuzen /
World
/ Croatia
/ Dubrovnik-Neretva
/ Opuzen
World / Croatia / Splitsko-Dalmatinska
road bridge, cable-stayed bridge
The bridge is intended to connect the Croatian peninsula of Pelješac, and through it the southernmost part of Croatia including Dubrovnik, with the Croatian mainland, while avoiding crossing Bosnia and Herzegovina at the Neum Corridor.
Construction started on 30 July 2018, and the bridge was joined together on 28 July 2021. The bridge and its access roads opened for traffic on 26 July 2022.
Construction started on 30 July 2018, and the bridge was joined together on 28 July 2021. The bridge and its access roads opened for traffic on 26 July 2022.
Wikipedia article: http://en.wikipedia.org/wiki/Pelješac_Bridge
Nearby cities:
Coordinates: 42°55'54"N 17°32'7"E
- Bridge of Rogotin 13 km
- Blažo Jovanović Bridge 151 km
- Millennium Bridge 151 km
- Morachica Bridge 154 km
- New Bridge 188 km
- Road and rail bridge across the Kir river 191 km
- Road bridge 199 km
- Bridge 199 km
- Bridge 203 km
- Road & Railway Bridge 272 km
- Bay of Klek-Neum 4 km
- Klek 5 km
- Vlaka 8 km
- Wind farm Ponikve 8.7 km
- River delta of Neretva 11 km
- Pelješac Peninsula 12 km
- Dingač 16 km
- Neum Municipality 18 km
- Baćina lakes 19 km
- Strait of Pelješac 34 km