DC Blox data center campus (BHM-1) (Birmingham, Alabama)

USA / Alabama / Birmingham / Birmingham, Alabama
 data center  Add category
 Upload a photo

SOLD TO DC BLOX IN 2018 TO DEVELOP THEIR BIRMINGHAM DATA CENTER CAMPUS. THE INITIAL DATA CENTER HALLS, COMMISSIONED IN JULY, 2019, SUPPORT 6 MEGAWATTS OF POWER. THE CAMPUS CAN SUPPORT UP TO 60 MEGAWATTS WHEN FULLY DEVELOPED.

THE FORMER INGALL’S IRONWORKS/TRINITY STEEL SITE IS A 27.3 ACRE SITE IN DOWNTOWN BIRMINGHAM, AL. THE SITE IS A REGISTERED BROWNFIELD IN THE ALABAMA BROWNFIELD VOLUNTARY CLEAN UP PROGRAM. THE SITE IS LOCATED LESS THAN A MILE FROM INTERSTATE 65 AND HAS ALL UTILITIES IN PLACE.