| |||||||
Unautherised earth road (2.3 Km)Constructed by Bhushan pvt Ltd in the Hirakud dam reservoir areaUnauthorised 2.3 Km Earth Road Constructed By M/s Bhusan Pvt Ltd , Which is Abstacling summer water flow of IB rever as a result sason main canal is affected also its leading for silt deposit in Hirakud dam reservoir .
| |||||||
|
|||||||