Suncor South Tailings Pond
| quarry pond
Canada /
Alberta /
Wood Buffalo /
World
/ Canada
/ Alberta
/ Wood Buffalo
World / Canada / Alberta / Division No. 16
quarry pond
Add category

After the bitumen has been separated from the sand, the sandy residue is pumped here. Cyclones along the edge of the pond separate the coarser sand fractions and dump them along the edge of the pond. This forms the bulk of a dam around the border of the pond. The smaller silt and clay fractions are discharged towards the center of the pond where they can settle out leaving water which can be recycled or treated and released.
Nearby cities:
Coordinates: 56°52'9"N 111°19'57"W
- Tailing pond 7 15 km
- Tailings Pond 26 km
- Syncrude Canada Ltd. "Mildred Lake" Settling Basin 34 km
- Tailings Pond 67 km
- George Reed Quarry 2199 km
- Quarry Lake 2272 km
- Kuparuk River Unit Mine D 2353 km
- Rock Quarry 2965 km
- Lhoist North America 3017 km
- Lake Sand Plant Mine 3926 km
- Athabasca Oil Sands 21 km
- Syncrude Mildred Lake 32 km
- Suncor Energy - Mackay River SAGD Project 39 km
- Shell Muskeg River mine project 41 km
- Sunrise SAGD Project (Husky Energy) 44 km
- Shell Jackpine Mine Project 44 km
- Joslyn oil sands project 51 km
- Aurora North Mine (Syncrude) 53 km
- Imperial Oil Kearl bitumen extraction project 55 km
- Horizon Oil Sands Project (CNRL) 67 km
Athabasca Oil Sands
Syncrude Mildred Lake
Suncor Energy - Mackay River SAGD Project
Shell Muskeg River mine project
Sunrise SAGD Project (Husky Energy)
Shell Jackpine Mine Project
Joslyn oil sands project
Aurora North Mine (Syncrude)
Imperial Oil Kearl bitumen extraction project
Horizon Oil Sands Project (CNRL)